POBDS / 12
Face target
Select Face target in an Action node. Configure its declared parameters below, then connect the node’s FINISHED / FAILED events as needed. A persistent Action must explicitly finish; interruption calls Exit rather than reporting success.
Configuration
Parameters and pins
| Name | Type | Direction | Default | Meaning |
|---|---|---|---|---|
| FlowAction.Delay | Float (s) | configuration | 0 | Delay before entering this Action, in seconds quantized to simulation milliseconds; separate from an Action-specific wait duration. |
| FlowAction.EveryFrame | Boolean | configuration | false | Continuous execution option; for example, keep invoking a method each frame. Unfinished Actions still receive Update; this does not force completion or repeat Enter. |
| FlowAction.FinishEvent | String | configuration | "" | Optional event when this Action finishes; empty does not prevent the node from emitting FINISHED once every Action completes. |
| FlowAction.FailEvent | String | configuration | "" | Optional failure event for this Action; connect error handling as needed. Interruption is not success. |
Output / result: See execution completion rules
Example
Entry → Action [Face target] → FINISHED → Return. Use FAILED for error handling. Enable continuous updates only where needed.
Completion and interruption
An Action node advances when all Actions finish. Exit also runs on interruption, but interruption does not emit a false success. Milliseconds, seconds and world units are not interchangeable.